Skip to main content

Va. Route 9 closure requires detours for W.Va, Md. commuters

For the 17,000 daily commuters who typically funnel through the tiny town of Hillsboro, in western Loudoun County, the complete closure of Virginia Route 9 will require detours starting Monday.

The less than 1-mile stretch of two-lane state highway through the historic town is completely closed for the ReThink9 road and pedestrian project, affecting commuters from Virginia, Maryland and West Virginia.

route 9 regional detour
Commuters who use Route 9 through the town of Hillsboro, in Loudoun County, Virginia will need to take an alternate route, as the two-lane road is completely closed within Hillsboro. (Courtesy ReThink9)

“For the vast majority of daily commuters heading east, who originate from West Virginia, the safest and fastest route will be to use the four-lane (West Virginia) Route 340 to Virginia Route 7,” said Hillsboro Mayor Roger Vance.

As WTOP reported in mid-April, Hillsboro and Virginia Department of Transportation decided to take advantage of low traffic volume during stay-at-home orders associated with coronavirus to begin the most intrusive aspect of the project earlier than planned — total closure of Route 9 within the limits of the town, which has a population of under 100 people.

In addition to the regional detour of Routes 340 and 7, a local detour around the work zone will provide access to wineries, vineyards, breweries and restaurants close to Hillsboro.

“For the bulk of all commuters, the local Hillsboro detour will not be a good alternative, as speed limits on the two-lane detour routes have been reduced, and will be vigorously enforced,” said Vance.

More than 100 detour signs have been constructed and installed in Loudoun and Clarke counties in Virginia as well in Jefferson County, West Virginia. Maryland commuters who cross the Potomac River west of Brunswick, in Frederick County, and take Harper’s Ferry Road will likely prefer to stay on Route 340 to Route 7.

The complete closure of Route 9 through Hillsboro will last until mid-June, said Vance.

The scheduled 428-day project is expected to be completed in May 2021.

“While we’re hopeful we can complete the project ahead of schedule, we’re not going to make a projection at this time.”

route 9 detour local businesses
The Route 9 regional detour around Hillsboro is Routes 340 and 7, but the local detour map directs to wineries and other businesses near Hillsboro. (Courtesy ReThink9)

A golf course for ‘the people’ faces a presidential makeover

WASHINGTON (AP) — A pack of cyclists whisked by along the circuit at East Potomac Park while the golf course parking lot filled with luxury SUVs parked next to older, inexpensive economy cars, all with the Washington Monument in the background. The scene highlighted what residents say are the park's best features: its accessibility and affordability right in the nation's capital. The historic park, especially the golf course, has caught the eye of President Donald Trump, who wants to turn it into a world-class golf venue. It's part of his grand vision for Washington, D.C., where he has torn down storied structures, remade or renamed others and deployed the National Guard for more than a year. But some residents fear the planned changes to the golf course — where Trump has visited with a cabinet member, a well-known golf course architect and blueprints — risk altering the character of a place that has served Washingtonians of many stripes for more than a century. Turning the park into an upscale golf course will mean costlier fees and a loss of public space, residents worry.
Read Next Story