Skip to main content

Crosstrail Boulevard opening in Va., ahead of Loudoun United stadium

The new Loudoun United soccer stadium in Leesburg, Virginia, won’t be ready for games until Aug. 9, but a stretch of road offering much-needed access to the stadium complex opens Wednesday.

Until now, there has only been one small road — Claudia Drive — to get into and out of the portion of Philip A. Bolen Memorial Park, adjacent to where Loudoun United’s new stadium is being built.

A new stretch of Crosstrail Boulevard will provide a new, second entryway into the complex from Sycolin Road, across the street from Leesburg Executive Airport.

“This will provide a new signalized intersection at Sycolin Road,” Loudoun County Supervisor Matt Letourneau told WTOP. “It will help unlock our Loudoun United project, and provide access to our new stadium, so we can be ready for play later this summer.”

A new segment of Crosstrail Boulevard will connect the stadium site with Sycolin Road — which is in the midst of a Leesburg widening project — south of the airport, providing access to those traveling from neighboring Ashburn.

This map shows the stretch of road being opened as Crosstrail Boulevard. (Courtesy Loudoun County)

“We’ll be able to circulate traffic a little bit better into that area,” said Letourneau. “Our traffic studies show that with this addition, we can move traffic more effectively.”

Related Stories

The Loudoun United stadium will have a seating capacity of 5,000.

“When we have a stadium event, when we have a large number of people leaving at the same time, having multiple ways to get in and out of the area will be very helpful,” Letourneau said.

While the new stretch of Crosstrail will offer a second way into the complex from Sycolin Road, a still-to-be-built stretch of Crosstrail connecting to Route 7 is still approximately two years away, Letourneau said.

Currently, a stretch of Crosstrail Boulevard at Route 7 runs only a few hundred feet, ending at Russell Branch Parkway, near Leesburg.

“We also have a project to connect the rest of Crosstrail Boulevard with Route 7,” Letourneau said. “That’s been funded by the Board of Supervisors and is currently underway with the county.”

The newly open portion of Crosstrail Boulevard passes the barricaded end of Kincaid Boulevard, which was built by the county, but has not opened to traffic.

“It’s within the limits of the town of Leesburg, and the Leesburg Town Council has elected to not open the road,” because of residents’ concerns about cut-through traffic.

Kincaid Boulevard runs between Battlefield Parkway, through the Kincaid Forest neighborhood, to the Bolen Park complex.

“The Town Council has said once Crosstrail Boulevard is fully completed (to Route 7), they will open Kincaid Boulevard,” said Letourneau.

A golf course for ‘the people’ faces a presidential makeover

WASHINGTON (AP) — A pack of cyclists whisked by along the circuit at East Potomac Park while the golf course parking lot filled with luxury SUVs parked next to older, inexpensive economy cars, all with the Washington Monument in the background. The scene highlighted what residents say are the park's best features: its accessibility and affordability right in the nation's capital. The historic park, especially the golf course, has caught the eye of President Donald Trump, who wants to turn it into a world-class golf venue. It's part of his grand vision for Washington, D.C., where he has torn down storied structures, remade or renamed others and deployed the National Guard for more than a year. But some residents fear the planned changes to the golf course — where Trump has visited with a cabinet member, a well-known golf course architect and blueprints — risk altering the character of a place that has served Washingtonians of many stripes for more than a century. Turning the park into an upscale golf course will mean costlier fees and a loss of public space, residents worry.
Read Next Story