Skip to main content

VDOT unveils final designs for W&OD Trail bridge over Lee Highway

State transportation officials have firmed up their plans for a new bike and pedestrian bridge over Lee Highway in East Falls Church, putting the project on track for construction to kick off next spring.

VDOT unveiled final designs for the planned Washington & Old Dominion Trail bridge at a community meeting last Thursday (Oct. 11), sketching out more details on the bridge that is designed to offer a safer alternative to the trail’s current crossing at the highway’s intersection with Fairfax Drive.

The bridge’s design is largely unchanged from plans that VDOT showed off last summer. Some of the biggest changes include the removal of a barrier with streetlights running down the middle of the bridge and a change to the “piers” holding up the bridge — they now include open space in the middle of their “v” shape.

Officials initially proposed a design for the bridge that featured a trussed roof and red paint, yet some neighbors objected to those features, as well as the bridge’s potential to disrupt long-range plans for the area’s transportation networks.

Planners ultimately changed the bridge’s color and removed the roof, and even agreed to tweak the lighting features on the bridge too. Instead of a barrier lined by street lights, the bridge will now include lighting underneath the v-shaped posts running along its sides.

VDOT also detailed potential traffic disruptions prompted by the bridge’s construction at the meeting. Officials expect that there will be temporary closures on Lee Highway as the bridge’s beams and girders are put in place, and they expect that the fire lane on Fairfax Drive will be closed as construction continues. The W&OD Trail will also be realigned temporarily to allow for the construction, and could also see some temporary closures.

Planners are tentatively hoping to begin work on the bridge early next year, then wrap it up by the fall of 2020. The work will also move in tandem with the I-66 eastbound widening project, which VDOT also hopes to complete in late 2020.

A golf course for ‘the people’ faces a presidential makeover

WASHINGTON (AP) — A pack of cyclists whisked by along the circuit at East Potomac Park while the golf course parking lot filled with luxury SUVs parked next to older, inexpensive economy cars, all with the Washington Monument in the background. The scene highlighted what residents say are the park's best features: its accessibility and affordability right in the nation's capital. The historic park, especially the golf course, has caught the eye of President Donald Trump, who wants to turn it into a world-class golf venue. It's part of his grand vision for Washington, D.C., where he has torn down storied structures, remade or renamed others and deployed the National Guard for more than a year. But some residents fear the planned changes to the golf course — where Trump has visited with a cabinet member, a well-known golf course architect and blueprints — risk altering the character of a place that has served Washingtonians of many stripes for more than a century. Turning the park into an upscale golf course will mean costlier fees and a loss of public space, residents worry.
Read Next Story