Skip to main content

NTSB report: Metro operator thought derailment was stuck brake

A preliminary report from the National Transportation Safety Board (NTSB) that warns subway systems and commuter railroads nationwide about a wheelset problem also includes more details on how events unfolded following Metro’s Oct. 12 derailment.

After the Blue Line train came to rest between the Rosslyn and Arlington Cemetery stations, the train operator told the control center that he believed there was a stuck brake, according to the NTSB.

The report says a rail controller then told the operator to try to move the train, which wasn’t possible. The derailed axle was noticed after a supervisor arrived on scene.

The update says the derailment happened at around 4:51 p.m., power was cut off to the third rail at 5:03 p.m., and that the evacuation of passengers began at 6:20 p.m. and finished at 7:16 p.m.

Damage was estimated at $715,000 by Metro.

The NTSB said one of the multiple areas it’s investigating is the response from rail traffic controllers.

That derailment led to Metro pulling the majority of its rail cars from service. Metro now says an initial round of testing has been completed, and next steps will be determined after consulting with the Washington Metrorail Safety Commission.

Washington Manassas Airport cleared to offer commercial airline flights

Washington Manassas Airport, formerly known as Manassas Regional Airport, has taken a big step toward its goal of offering passenger service. The airport, which is owned by the city of Manassas, Virginia, received its FAA Part 139 Airport Operating Certificate, a designation required before commercial airlines can begin service. During a ceremony Monday, FAA Associate Administrator Dan Edwards presented a framed version of the certificate to airport leaders.  Edwards said it's "extremely rare" for an existing airport that caters to private flights to clear this hurdle. 
Read Next Story