Skip to main content

Debris on Outer Loop causes flats for drivers

Debris scattered across the highway from Alexandria in Virginia to Ritchie-Marlboro Road in Prince George’s County, Maryland, caused problems on the Capital Beltway’s Outer Loop for a number of drivers Tuesday morning. WTOP Traffic Reporter Jack Taylor reports “upwards of two dozen” drivers had flat tires. In some cases, the vehicles had more than one flat. “Be very careful,” Taylor said as the problem was going on, adding that a quarter of the Outer Loop was affected.

X

To view this content from @WTOPtraffic on X, click here.

The problems began before 5 a.m. Initially, problems were reported in Prince George’s County from Temple Hills to Largo. Then, reports of problems started coming in from Virginia. Around 6 a.m., multiple vehicles were on both shoulders of the Woodrow Wilson Bridge with flats. A tractor-trailer was among the vehicles with flats, WTOP Traffic said.

X

To view this content from @WTOPtraffic on X, click here.

Delays on the Outer Loop dissipated by 7 a.m. It’s not clear what the debris is and whether the debris in Virginia is the same as the debris in Maryland. Tina Regester, spokeswoman for the Maryland State Highway Administration, said several vehicles had struck a piece of metal on the Outer Loop near St. Barnabas Road. WTOP has calls out to the Virginia Department of Transportation.

Kennedy Center renews call for Trump-backed shutdown after part of a ceiling collapses

WASHINGTON (AP) — A chunk of ceiling fell inside a main hallway of the Kennedy Center, according to a spokesperson who said the damage underscores the need to shut down the historic arts venue for renovations sought by President Donald Trump. No one was injured when a piece of the ceiling inside the Kennedy Center's grand foyer collapsed Friday evening, said Roma Daravi, the center's vice president for public relations. Photos provided by the center showed a large hole in the high ceiling and debris littering the red carpet in part of the hallway that connects the Kennedy Center's three main performance auditoriums. The damage occurred during stormy weather in Washington. The Kennedy Center's Trump-aligned board is fighting in court to move forward with plans to add Trump's name to the building's facade and to close the center for two years as it undergoes $250 million in renovations.
Read Next Story