Skip to main content

Cool air to begin blowing again at Dupont, Farragut North stations

WASHINGTON – A long-awaited, but temporary, fix to cool the Dupont Circle and Farragut North Metro stations is expected to be up and running this weekend.

Related Stories

Testing of the temporary cooling tower sitting along Connecticut Avenue and the pipes connecting it to the chiller plant below began Thursday morning, Metro General Manager Paul Wiedefeld said.

“We’ll test it, run it for about eight hours today. And we’ll do some tests for the next two days, and hopefully have that fully running. But it’s so far so good, it’s working fine,” Wiedefeld said.

If testing goes well, the chiller system would be back in service on Saturday.

The temporary tower and pipes go around the leaky, aging pipes connecting the permanent cooling tower on top of a nearby building to the chiller plant beneath Connecticut Avenue. Problems with those pipes took out the chilling system in the summer of 2015, and there has been no fix since.

Although riders could feel some relief starting this weekend, a permanent repair has not yet been designed. Implementing that permanent fix would likely require significant digging under Connecticut Avenue, which would disrupt traffic.

Washington Manassas Airport cleared to offer commercial airline flights

Washington Manassas Airport, formerly known as Manassas Regional Airport, has taken a big step toward its goal of offering passenger service. The airport, which is owned by the city of Manassas, Virginia, received its FAA Part 139 Airport Operating Certificate, a designation required before commercial airlines can begin service. During a ceremony Monday, FAA Associate Administrator Dan Edwards presented a framed version of the certificate to airport leaders.  Edwards said it's "extremely rare" for an existing airport that caters to private flights to clear this hurdle. 
Read Next Story