Skip to main content

DC chooses contractors for new Douglass Memorial Bridge project

WASHINGTON — Watsonville, California-based Granite Construction Inc. and Atlanta-based Archer Western have been awarded the South Capitol Street Corridor Phase 1 design-build contract by the District Department of Transportation.

The joint venture project is worth $441 million.

The contract award comes more than four years after the District narrowed the list of possible contractors to four.

Granite and Archer Western will be responsible for the replacement of the existing Frederick Douglass Memorial Bridge over the Anacostia River. The project includes the construction of two new approach ovals and the reconstruction of a portion of Interstate 295 adjacent to the new bridge.

The project includes the construction of two new approach ovals and the reconstruction of a portion of Interstate 295 adjacent to the new bridge. (Courtesy District Department of Transportation)

The bridge will have six lanes, and improved bicycle and pedestrian access when it is finished.

Granite Construction said the bridge project is expected to be completed by December 2021.

The bridge and South Capitol Street corridor project are part of the much larger 30-year, $10 billion Anacostia Waterfront Initiative.

DC nonprofit marks 15 years of making fresh food a corner store staple

Corner stores aren't usually known for being fresh fruit and vegetable hubs. D.C. Central Kitchen has spent 15 years working to change that in the District, with a focus on lower-income neighborhoods without easy access to the healthy choices found in other parts of D.C. Related stories Neighbors fundraise to reopen historic grocery store on Capitol Hill DC Italian grocery and deli crosses the century mark
Read Next Story